Acquisition Efficiency

This page contains 3 requirements.

Page summary

Metric

Value

Total requirements

3

Status: Compliant

3

Verification: Design

3

Result: PASS

3

Requirements

NGPS-SCI-REQ-0510 — Elapsed time from the end of telescope slew until initiation of a science integ…

Field

Value

Identifier

NGPS-SCI-REQ-0510

Source

NGPS.SCI.DRD.001.docx

Source section

3.6

Category / request

Acquisition Efficiency

Importance

Must Have

Status

Compliant

Verification method

Design

Result

PASS

Requirement

Elapsed time from the end of telescope slew until initiation of a science integration shall be less than 120 seconds with a goal of 90 seconds.

Notes / verification evidence

90s req PASS in auto acq. mode

NGPS-SCI-REQ-0520 — In order to support NGPS-SCI-REQ-0510, the spectrograph shall have acquisition…

Field

Value

Identifier

NGPS-SCI-REQ-0520

Source

NGPS.SCI.DRD.001.docx

Source section

3.6

Category / request

Acquisition Efficiency

Importance

Must Have

Status

Compliant

Verification method

Design

Result

PASS

Requirement

In order to support NGPS-SCI-REQ-0510, the spectrograph shall have acquisition software capable of recognizing the star field of any area of the sky, calculate an astrometric solution, and apply offsets to the telescope pointing to center the desired target on the slit.

Notes / verification evidence

Two step method using both acam astrometry and scam feedback for fine tuning of centering

NGPS-SCI-REQ-0530 — The acquisition and guide system shall have a field of view shall be at least 2…

Field

Value

Identifier

NGPS-SCI-REQ-0530

Source

NGPS.SCI.DRD.001.docx

Source section

3.6

Category / request

Acquisition Efficiency

Importance

Must Have

Status

Compliant

Verification method

Design

Result

PASS

Requirement

The acquisition and guide system shall have a field of view shall be at least 2.5’ x 2.5’ (3’ x 3’ goal).

Notes / verification evidence

Slicecams cover 1’x1’. acam covers 4.4’x4.4’